Gulf of Aqaba Submarine Cable Crossing

Civil works at cable end terminal, consisting of cable trenching from terminal building to 50m water depth in sea with all cable protection and 50m long road crossing, and the oil pumping station. Sub-contracted from Alcatel of Norway.

Completed 1998

All rights are reserved to Masannat Engineering & Contracting Company © 2012